You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Blocked drain

Reported via desktop in the Drainage Structure: Blockage category anonymously at 08:19, Sun 26 November 2023

Sent to Island Roads 1 day, 2 hours, 31 minutes later. Enquiry ref: 16255997.

After recent wightfibre works the drain is blocked, i suspect it highly likely that they dropped soil / rubble in it whilst digging right next to it. As a result in recent storms water gushed out of it and there is a constant river flowing down the road on what is a bad bend. If this were to freeze it could cause a serious RTA

RSS feed of updates to this problem Receive email when updates are left on this problem.

  • State changed to: Investigating

    Updated by Island Roads at 10:53, Mon 27 November 2023

  • State changed to: Open

    Updated by Island Roads at 10:04, Wed 29 November 2023

  • State changed to: Action scheduled

    Updated by Island Roads at 10:04, Wed 29 November 2023

  • This issue has been fixed.

    State changed to: Fixed

    Posted by Island Roads at 04:49, Wed 6 December 2023

  • This report is now closed to updates from the public. You can make a new report in the same location.