Road is higher than the footpath drop curb following resurfacing works

Reported via mobile in the Rough/Uneven or Surface Issue category by Richard Hill at 22:57, Sun 5 November 2023

Sent to Island Roads 19 hours, 16 minutes later. Enquiry ref: 16254278.

Following the resurfacing works of the man. Road, this part of the road has been raised higher than the foot path and drop kerb. This results in allowing flood water from the highway to flow down into residential driveways and into properties. The level between the road substraight and kerb water line is not to standard and is actually flush.

I was also visited by an Isle of Wight council flood inspector who pointed this out and highlighted the road and kerb is not to standard following the re re surface of the road.

RSS feed of updates to this problem Receive email when updates are left on this problem.

  • State changed to: Investigating

    Updated by Island Roads at 18:23, Mon 6 November 2023

  • State changed to: Open

    Updated by Island Roads at 14:37, Wed 8 November 2023

  • State changed to: Investigating

    Updated by Island Roads at 19:51, Mon 13 November 2023

  • State changed to: Open

    Updated by Island Roads at 15:40, Mon 27 November 2023

  • Still open, via questionnaire, 18:32, Mon 4 December 2023

  • Still open, via questionnaire, 19:03, Monday 1 January 2024

  • Still open, via questionnaire, 20:21, Monday 29 January 2024

  • Nothing has been done yet

    Posted by Richard Hill at 20:22, Monday 29 January 2024