Closed
Gulley blocked and water flowing down Bullen Road
Reported in the Drainage Structure: Blockage category anonymously at 17:54, Thu 5 March 2020
Sent to Island Roads 8 hours later. Enquiry ref: 16170032.
Are the IR workforce going to return and complete the drainage works started in Bullen Road two weeks ago? The work carried out from the traffic lights to beyond Cothey Way is working to a degree but after that the gulley is still blocked up. Rainwater is flowing down Bullen Road. There is a drain on the opposite side of the road, outside The Farmhouse, Bullen Road totally blocked up with soil.
State changed to: Investigating
Updated by Island Roads at 02:09, Fri 6 March 2020
State changed to: Open
Updated by Island Roads at 14:13, Wed 11 March 2020
State changed to: Investigating
Updated by Island Roads at 10:10, Fri 13 March 2020
State changed to: Action scheduled
Updated by Island Roads at 10:12, Thu 26 March 2020
State changed to: Closed
Updated by Island Roads at 05:32, Fri 27 March 2020
This report is now closed to updates from the public. You can make a new report in the same location.